TEP Substation

The first application of PileMedic in an industrial setting was the repair of over seventy corroded steel poles in an electric substation for Tucson Electric Power (TEP). These poles were repaired in a very short time while the plant remained fully operational.

A technical paper that describes the details of this project was published in the January 2012 issue of Structure Magazine. You can click on this link to download the paper in pdf format.

In addition, we invite you to click on this link for a brochure describing this application.